Sunday, January 29, 2012

One Man Motor Install

If you've ever worked on a CB 750 you know what a pain in the but it is pulling out or putting in this gigantic mill. I was stoked and couldn't wait for help so I went at it alone. First I laid the motor on it's right side on some foam floor mats and kinda propped up the rear end with a 2X4.


Then I pulled everything off the frame. (I had it set up as a roller)






Next I lowered the frame onto the motor.

Put the motor mounts in and began re-assembling the roller.

Easy greazy... I feel like this is going to be a fun bike!




Saturday, January 28, 2012

Fork Lowering on the Phsyco 78.

I got the forks cut down a bit this week.
Here's all the guts... You can see the 2" I cut off of the compression spring.

Here are the spacers I machined out. I've used PVC pipe before but it just doesn't feel right to me. Aluminum wasn't the best option, I'd rather have used brass, but I couldn't dig any up...

Here it is all lowered.

Thursday, August 4, 2011

We had a pretty good day at the shop today. We got the frame lined with the plumb bobs.

 Plumb bob showed that we were a 1/4" off center. We got it centered up and locked down and commenced to cutting off all the unnecessary shit.
  We started off by scavenging the unusable stuff and using it as a cross brace.

Support brace all tacked in to support the side uprights. Now time to hack off the rear section!

Time to bust out the grinder to clean up the welds and gussets that services are no longer needed.
Holly crap! Sparks are flying out of my head!!!

  Once the grinding was done, we used electrical conduit to figure out all our bends. Glad we did being that we had to go back to the drawing board after our first bend...


Portaband is my new favorite toy! Here Jared shows us it ease of use.


  While I was grinding, Jared decided to jump start my boys with their welding school.Here he is teaching Strider (13) how to arc weld.

As usual Gavin (11) picked up on it quick!


Back to the build: Once we got the conduit cut and bent the way we liked it we moved onto the tubing. But found that there was a mix up at Barber Metals and they mistakenly gave us the wrong tubing. The O.D. was .06" to big and wouldn't fit into the bender. So after a OCC style argument between me and Jared we jumped in the truck and headed to Barber Metals to get the problem fixed. They were totally cool about it and said that they will have the right tubing in the morning. They kick ass! I highly recommend them if your building a bike and live in Utah county.