Showing posts with label Frame Jig. Show all posts
Showing posts with label Frame Jig. Show all posts

Wednesday, August 3, 2011

Frame Jiggity Jig

So the other day I was finishing the Jig, and I got only 3 pics off before the camera died.  So this is what you get from construction phase, but Brady should have some from today up soon.
Tail Stem

Neck Stem

The Legs all drilled and ready to go.

The Jig is done.

Levelers, I bit of wobble if you shake it like the dickens otherwise, stable.

Brady in Jock shorts and ashamed.

Yep, who would of thunk.

Sunday, July 3, 2011

Neck Adjuster

 


So! It's been so long since I've gotten to machine an assembly of parts. For the last (I don't know) 6 years I've been running nothing but production on just a few parts. So once I machine a part and it leaves my hands that the last I get to see of it. It really takes the satisfaction out of being a machinist. Machining these frame jigs have probably been way more entertaining to me then you blog readers, But I'm totally stoked on how it's turning out. Most of the parts for this neck adjuster are complete. I just need to turn out the last two parts that will support the neck tube. Hopefully those will be done today! Then I can send everything to Jared so he can fuse it all together with his fancy TIG welder. This frame jig should make some damn nice frames! I held every dimension way tighter than I probably needed to. But I enjoyed doing it that way. TIGHT... Gangsta style...


So tight Jared probably doesn't even have to weld it...

Sunday, June 26, 2011

Ready to Drill


This is one of the feet for the jig.  All center punched and ready to drill, Brady is coming through with some nice drilling fluid.

Man!

You got laid the effe out!


Base plates

So I couldn't wait to get the base plates machined today. The raw
Stock was so warped that to could practically eat cheerrios out it.
I threw it up on the press and tried to flatten it out some.


Saturday, June 25, 2011

Frame jig *update*

Didn't get much done on the frame jig today. I got the neck/axel support plates squared up.hopefully I can get the centers cut out tomorrow then send them back to jared so he can weld them up. After jared does his thing I'll machine the base plates flat.


Monday, June 20, 2011

Frame jig conundrum.

Well the Jig should of been secured better before welding. Always clamp your stuff down!!

No real good picture from the side here, but you can see the HAZ (Heat Affected Zone) from our torch application.  Brady today used a Bobcat to bend the jig using a press like attempt. (video and pictures to come)  He got a ton of the bend out of it.  Now when we say it's bent it's not queer eye for the gay guy, more like over a 8 foot span the middle is off the ground 3/8".  And well when he got back to the shop he wasn't happy with it so, after being told by his dad and me that you could use the torch and bend it back using the natural reaction metal has when heat is applied, he went to town. Long story short he negated all the Bobcat had done.  So as I called to let him know I was going to drop off the neck and tail stands, he humbly asked for my assistance in fixing the situation.
Truth be told I have never done this either, but learned about it at a Welding Metallurgy seminar last week.  So all the HAZ's you see are from me heating up different area's methodically from the center out.  At first I was discourage, and I knew that the metal was going to bend worse before it bent better, but it was slow moving.  But by the time I left the jig had moved about 3/16 down.  We don't need much, cuz we are going to machine the top and inside the gap, but still.  Yea for a long story!